Lake Shore Gold

Lake Shore Gold

Posted on: Aug 25,2016

CSCA Mandate:

Install and commission a waste water system which would enable the mine to increase its manpower by 200 individuals. The project was completed within a one week timeline which eliminated the need to shut down operations.